![]() Debug Information | |
| Version | 1.71 |
| Current Component | com_content |
| Current Instance | 0 and belongs to group [mhi_instances_active_common] |
| Selected file is [212.jpg] | |
| SLIDE SHOW | Looking for files named as [212] |
| 5 regular files for slideshow found in [/home/nwengcom/public_html/images/stories/headerimages/]: | |
| -> [212.1.jpg] | |
| -> [212.2.jpg] | |
| -> [212.3.jpg] | |
| -> [212.4.jpg] | |
| -> [212.5.jpg] | |
| Transition effect used, looping indefinitely. | |
| For support visit: | http://forge.joomla.org/sf/projects/mod_header_image |
| YOUR DONATION: | Support for this module or use of it on a commercial site is based on DONATIONS: http://www.pillwax.com/open-source-world-support Please contribute your part to it. |
| Pine Str Water Main, Carlton, OR |
Approximately 2000 LF of 12- and 8-inch diameter water mains were installed in this project. Most of the work was in ODOT rights-of-way. A live connection to an existing water main was made using a line stop valve. Six fire hydrants were also replaced during the project. We prepared all design and specifications for the project, assisted with the project bidding and contract award, and reviewed submittals and conducted periodic inspections during the construction.
|
| < Prev | Next > |
|---|