![]() Debug Information | |
| Version | 1.71 |
| Current Component | com_content |
| Current Instance | 0 and belongs to group [mhi_instances_active_common] |
| Selected file is [212.jpg] | |
| SLIDE SHOW | Looking for files named as [212] |
| 5 regular files for slideshow found in [/home/nwengcom/public_html/images/stories/headerimages/]: | |
| -> [212.1.jpg] | |
| -> [212.2.jpg] | |
| -> [212.3.jpg] | |
| -> [212.4.jpg] | |
| -> [212.5.jpg] | |
| Transition effect used, looping indefinitely. | |
| For support visit: | http://forge.joomla.org/sf/projects/mod_header_image |
| YOUR DONATION: | Support for this module or use of it on a commercial site is based on DONATIONS: http://www.pillwax.com/open-source-world-support Please contribute your part to it. |
| Meadow Lake Water Main, Carlton OR |
The only transmission line bringing water into Carlton is supported on the Meadow Lake Bridge. The bridge had deteriorated and was in need of replacement. As part of the replacement project, we designed a new water main both supported on the new bridge and under the new pavement construction each side of the new bridge as part of the bridge project. This included about 1600 LF of 16-inchdiaameter water main. The bridge portion was designed with hanger supports, expansion joint, and was seismically designed to meet all regulations.
|