Skip to content

Debug Information

Version1.71
Current Componentcom_content
Current Instance0 and belongs to group [mhi_instances_active_common]
Selected file is [213.jpg]
SLIDE SHOWLooking for files named as [213]
5 regular files for slideshow found in [/home/nwengcom/public_html/images/stories/headerimages/]:
-> [213.1.jpg]
-> [213.2.jpg]
-> [213.3.jpg]
-> [213.4.jpg]
-> [213.5.jpg]
Transition effect used, looping indefinitely.
For support visit:http://forge.joomla.org/sf/projects/mod_header_image
YOUR DONATION:Support for this module or use of it on a commercial site is based on DONATIONS: http://www.pillwax.com/open-source-world-support
Please contribute your part to it.
You are here: Home arrow Projects arrow Sanitary Sewer arrow Hawn Creek Pump Station, Carlton, OR
Hawn Creek Pump Station, Carlton, OR
HawnCreekds.jpgThe project included a determination of the 20-year flow projection to meet DEQ requirements. The existing station utilized self priming pumps in a small building. The new design included two submersible pumps installed in the existing wetwell. Pump Station firm capacity was 1,175 gpm utilizing 60 HP pumps. A new control panel, new valve vault, and emergency electric generator with automatic transfer switch were also included in the project. Our services included assisting in receiving construction bids, reviewing all submittals, monitoring the construction process, and preparing the operation and maintenance manual for the pump station.
 