Skip to content

Debug Information

Version1.71
Current Componentcom_content
Current Instance0 and belongs to group [mhi_instances_active_common]
Selected file is [213.jpg]
SLIDE SHOWLooking for files named as [213]
5 regular files for slideshow found in [/home/nwengcom/public_html/images/stories/headerimages/]:
-> [213.1.jpg]
-> [213.2.jpg]
-> [213.3.jpg]
-> [213.4.jpg]
-> [213.5.jpg]
Transition effect used, looping indefinitely.
For support visit:http://forge.joomla.org/sf/projects/mod_header_image
YOUR DONATION:Support for this module or use of it on a commercial site is based on DONATIONS: http://www.pillwax.com/open-source-world-support
Please contribute your part to it.
You are here: Home arrow Projects arrow Sanitary Sewer arrow Cutler City Pump Station, Lincoln City, OR
Cutler City Pump Station, Lincoln City, OR
CutlerCity.jpgOur design included new submersible pumps located in the wetwell (retrofitted the existing wastewater wetwell and constructed a new wetwell for the stormwater station), and the electrical controls located in a new control building. The building was designed to fit in architecturally with the surrounding residential area. The wastewater station includes two pumps and the stormwater station includes three pumps. New valve vaults were designed for each station. Each station connects to its existing force main leading away from the site. An emergency generator is located in a separate room next to the control panel room. This generator is sized so that both pump stations can operate at full capacity in the event that normal electrical power to the station is interrupted.
 
< Prev   Next >