![]() Debug Information | |
| Version | 1.71 |
| Current Component | com_content |
| Current Instance | 0 and belongs to group [mhi_instances_active_common] |
| Selected file is [213.jpg] | |
| SLIDE SHOW | Looking for files named as [213] |
| 5 regular files for slideshow found in [/home/nwengcom/public_html/images/stories/headerimages/]: | |
| -> [213.1.jpg] | |
| -> [213.2.jpg] | |
| -> [213.3.jpg] | |
| -> [213.4.jpg] | |
| -> [213.5.jpg] | |
| Transition effect used, looping indefinitely. | |
| For support visit: | http://forge.joomla.org/sf/projects/mod_header_image |
| YOUR DONATION: | Support for this module or use of it on a commercial site is based on DONATIONS: http://www.pillwax.com/open-source-world-support Please contribute your part to it. |
Projects
Sanitary Sewer
Country Haven Pump Station, Hillsboro, OR
| Country Haven Pump Station, Hillsboro, OR |
This project was a pump station rejuvenation that included designing replacements for two existing submersible pumps in a wet well. As part of the project, two new manholes were designed over existing influent sewers and a valve bypass connection in the existing valve vault was designed. NW Engineers conducted force main hydraulics calculations and pump analysis and selection. The client (Clean Water Services) was provided with options on pipe materials, fittings, joints, and other appurtenances. Engineering plans and construction specifications were generated based on final input from the client
|
| Next > |
|---|