Skip to content

Debug Information

Version1.71
Current Componentcom_content
Current Instance0 and belongs to group [mhi_instances_active_common]
Selected file is [213.jpg]
SLIDE SHOWLooking for files named as [213]
5 regular files for slideshow found in [/home/nwengcom/public_html/images/stories/headerimages/]:
-> [213.1.jpg]
-> [213.2.jpg]
-> [213.3.jpg]
-> [213.4.jpg]
-> [213.5.jpg]
Transition effect used, looping indefinitely.
For support visit:http://forge.joomla.org/sf/projects/mod_header_image
YOUR DONATION:Support for this module or use of it on a commercial site is based on DONATIONS: http://www.pillwax.com/open-source-world-support
Please contribute your part to it.
You are here: Home arrow Projects arrow Sanitary Sewer arrow Astoria-CSO Partial Sparation
Astoria-CSO Partial Sparation
Astoria-watershed-5-10-07-0 (Small).jpgThe city has experienced overflows from combined sewer system, and is under DEQ order to limits the overflows. The project designed approximately 20,000 feet of new storm drain system and 1,400 feet of sanitary sewer, including sections of new pipe, existing pipe, open channels, outfall modifications and pond routing in existing neighborhoods. After confirmation of design by City and the City's program manager, full survey, and final design, specification and construction documents are prepared for public bid. Project funded with Oregon State wastewater revolving loan fund monies, administered through Oregon DEQ. Fee of $200,000 dollars and an approximate construction cost of $2,000,000.
 
< Prev   Next >