Skip to content

Debug Information

Version1.71
Current Componentcom_content
Current Instance0 and belongs to group [mhi_instances_active_common]
Selected file is [211.jpg]
SLIDE SHOWLooking for files named as [211]
6 regular files for slideshow found in [/home/nwengcom/public_html/images/stories/headerimages/]:
-> [211.1.jpg]
-> [211.2.jpg]
-> [211.3.jpg]
-> [211.4.jpg]
-> [211.5.jpg]
-> [211.6.jpg]
Transition effect used, looping indefinitely.
For support visit:http://forge.joomla.org/sf/projects/mod_header_image
YOUR DONATION:Support for this module or use of it on a commercial site is based on DONATIONS: http://www.pillwax.com/open-source-world-support
Please contribute your part to it.
You are here: Home arrow Projects arrow Roadway arrow Four Corners Industrial Phase II
Four Corners Industrial Phase II
0040-004016 (Small).jpgThis project includes engineering services in survey, design, and construction administration of 1,700 lineal foot of industrial roadway. The design included storm, sanitary, and water main extensions, curb and gutters, commercial driveways, street landscape and lighting. In addition, storm water impacts were analyzed and a storm report was prepared in support of a centralized water quality and detention facility for the new industrial roadway. Legal descriptions for the roadway were provided to the City of Molalla. The project also involved assistance to the City in acquiring the state highway road approach permit, and water and sanitary improvement permit from Oregon Department of Transportation.
 
< Prev   Next >